College View Stormwater Improvement – 07.02.21 Project Update

Posted on July 2, 2021 at 9:02 AM by Barbara Petrucci

College View Stormwater Improvement – 07.02.21 Project Update:

Earthwerks’ subcontractor has poured the curb and sidewalks near the school and along Berkley that were disturbed for the new storm sewer system.   The contractor has also patched the parking lot areas that were disturbed for the storm sewer.  While this work was being completed, Earthwerks continued with the excavation of the field and preparation of the stone base that the underground concrete detention system will be placed on.  Excavation and preparation will continue in anticipation of the underground detention system installation.