York/I-290 Stormwater Improvement Project Update 11/2/16

Posted on November 2, 2016 at 2:59 PM by Barbara Petrucci

York/I-290 Stormwater Improvement Project

Topsoil, seed, and erosion control blanket have been installed at the new detention basin.  Now that the shop drawings for the lift station have been approved, and the transformer pad is set, the contractor is in the process of getting all of the mechanical and electrical components ordered and fabricated.  The basin is functional at this time and will provide flood relief in the event of a severe rain event.  A temporary generator and pump is currently in place and will be utilized to remove water from the basin as needed until the permanent mechanical and electrical components are installed.

York_I-290 Stormwater Improvement Project Update Photo 11 2 16