Harrison Street: Status Update

Posted on February 19, 2016 at 11:44 AM by Amanda Stuber

Engineering staff recently met with representatives from Clark-Dietz to further discuss the preliminary design of the proposed stormwater improvements.  City staff is working with Clark-Dietz to evaluate the best possible option for achieving the desired additional stormwater storage while minimizing the impact to existing City infrastructure.  Preliminary drawings should be submitted to the City for review in early March.