Southwest Elmhurst Stormwater Mitigation Project - Phase I - 09.12.19

Posted on September 13, 2019 at 8:38 AM by Barbara Petrucci

The detention pond improvements are nearing completion.  The perimeter fencing is close to being finalized with only the various gates needing to be installed.  The landscaping around the perimeter of the site has been installed and the low profile prairie grass within the basin has started to become established.  The pump station is moving closer to completion; the pumps have been installed and the contractor is working with ComEd to make the final electrical connection.

9-12-19 Phase I Update