Pine/Avon Stormwater Improvement Project Update 08.25.17

Posted on August 25, 2017 at 9:10 AM by Barbara Petrucci

All underground utility work has now been completed for the project. The new relief storm sewer piping is “online” and ready in the event of a flood situation.  All concrete restoration (curb, sidewalk, and driveway aprons) has been completed.  Patching of the disturbed roadway will begin along First Street.  The landscape restoration of the detention basin site began and included seed and blanket installation. Cleaning of parkways, milling of the roadway, and installation of the final lift of asphalt are scheduled to take place the week of August 28th (weather permitting.)

Pine_Avon Stormwater Update 08 25 17