Dec 12

Geneva Avenue Stormwater Improvement Project Update 12/12/16

Posted on December 12, 2016 at 2:37 PM by Barbara Petrucci

Over the last several weeks the contractor completed the landscaping installation, underground storm sewer installation, and asphalt resurfacing on both Third Street and Geneva Avenue.  Although minor punchlist items will be corrected in the spring, the project is now officially complete and will provide immediate flood relief to the adjacent homes with the new 4 acre-foot stormwater detention basin.

                                          Geneva 1 

                Geneva 2 

                Geneva 3

                Geneva 4   
    
Nov 02

Geneva Ave Stormwater Project Update – 11/2/16

Posted on November 2, 2016 at 3:55 PM by Barbara Petrucci

Geneva Ave. Stormwater Project Update –11/2/16

Concrete work for the Geneva Avenue Stormwater Improvement Project is currently on-going.  Sidewalk and curb replacement on Geneva Avenue has been substantially completed and approximately half of the sidewalk replacement, and the majority of the curb replacement, has been completed on Third Street.  This week the contractor plans to complete the majority of the remaining sidewalk and curb replacement and to pour the final street patches on Third Street.  Landscaping work in the pond has begun and is on-going as weather allows.

                    Geneva Ave Stormwater Project Update Photo_1 11_2_16        
Geneva Ave Stormwater Project Update Photo_2 11_2_16

Oct 19

Geneva Ave Stormwater Project Update – 10/19/16

Posted on October 19, 2016 at 9:07 AM by Barbara Petrucci

Over the past several weeks, the contractor has completed work storm sewer installation work on Third Street and excavation of the detention pond on Geneva Avenue. The storm sewer installation on Third Street between Clinton Avenue and Geneva Avenue was substantially completed on October 7th and the excavation and grading of the detention pond was substantially completed on October 15th. This week, the contractor is scheduled to begin concrete work on Third Street. This work will include driveway approach replacement, street patching, and curb replacement. Following the concrete work, the contractor will be milling and paving Third Street.

Geneva Ave Stormwater Project Update – 10/19/16